Projects






Item Projects 2017 Allocation  2018 -2019 2020 Status Funding
 –  –  –  –  –  –
1.056 & 1.058 Concrete Restoration (Balconies, Facade, Concrete Balusters, Repairs and Paint Finishes)  $   500,000  $        479,000 Façade work has been completed.  Currently working on the roof machinery room towers. Expecting completion by the end of the 1st Quarter 2019 Reserve
1.180 Doors, Metal, Stairwells and Garages, Phased (Near term phasing per Management)  $     50,000  $        455,800 Met with Paul Martinez, PMM Engineer on 2/13/19, He will be working on revising the scope per our request. Expecting revisions to go out to vendors by Friday, March 1st, 2019. Reserve
1.182 Sliding Glass Doors  $       399,000  $   320,000 Met with Paul Martinez, PMM Engineer on 2/13/19, – waiting on engineer proposal  by Friday, March 1st, 2019 Reserve
1.186 Entry Door locks  $          23,200 Reserve
1.500 Roof Repairs  $          83,300 Met with Paul Martinez, PMM Engineer on 2/13/19, – waiting on engineer proposal  by Friday, March 1st, 2019 Reserve
1.860 Building Paint – Exterior façade  $          20,000  $   487,500 Met with Paul Martinez, PMM Engineer on 2/13/19, – waiting on engineer proposal  by Friday, March 1st, 2019 Reserve
2.100 Elevator Cab Finish /Protectors  $          21,000 Feb-19 Reserve
2.160 Exercise Equipment, Phased (2016 and 2018 are Partial per Management)  $        5,000  $          13,000 Completed Reserve
2.450 Furnishings, Common Areas, Phased (2017 and 2018 are Partial per Management)  $        2,000  $          10,000 Deferred – only if needed Reserve
2.800 Hallway Decoration  $          53,000 BOARD – to appoint Design Committee Reserve
2.98 Wall Coverings, Lobbies, Wood and Stone  $          32,500 Ongoing Reserve
3.050 Air Handling Units, Make-up Air, Hallways, Phased (2017 through 2019 per Management)  $    186,250  $        342,000 Jun-19 Reserve
3.195 Chiller, 80-tons, Tower One, Replacement (one Unit)  $        170,000 Currently Requesting Bids. – Looking to present to BOD for approval in the next two weeks Reserve
3.260 Cooling Towers, 80-tons, Capital Repairs (2018)  $        130,000 Completed Reserve
3.300 Electrical Panels  $        123,000
3.560 Life Safety System, Control Panels and Emergency Devices, Phased (Near Term Phasing per Management)  $   300,000  $       900,000 Dec-19 Reserve
3.600 Pipes – Risers heating & Cooling  $          15,000 Deferred – only if needed Reserve
3.600 Pipes – Domestic water lines – Garage  $          25,000 Deferred – only if needed Reserve
3.818 Security System, Cameras, Recorders and Monitors, Partial (2017 per Management)  $      20,863  $          25,000  $     25,000 Completed Reserve
3.920 Valves  $          66,000  $     75,000
4.043 Building Planters  $      50,000  $          30,000 Completed Reserve
4.220 Fence – North perimeter  $          50,000 Apr-19
4.328 Beach Furniture  $          35,280 Aug-19 Reserve
4.330 Gates Swing Arms (LED)  $          16,800
4.560 Light Poles and Fixtures, Phased  $          26,000 Deferred – only if needed Reserve
4.860 Tennis Courts, Surface Replacement  $           51,200 To Start April 2019 Reserve
6.600 Mechanical Equipment, Phased (Incl. Saline System)  $          34,500 Completed Reserve
6.800 Pool 1 Restoration  $        310,000 Met with Paul Martinez, PMM Engineer on 2/13/19, – waiting on engineer proposal  by Friday, March 1st, 2019.                 Pool Restoration to Start on June 2019. Reserve
6.865 Pool Bath Renovation  $          46,000 Jun-19
7.300 & 7.664 Concrete restoration – Garage  $          90,600 Jun-19 Reserve
7.497 Expansion Joints  $         121,600 Jun-19
7.664 Drain System, Lower Garage  $    286,700  $        542,000  $   250,000 Ongoing – meeting with Engineer on on Wednesday, 2/20/19 at 2:00 PM. Reserve
SA Window Replacement Project  $  13,200,000 Jan-20 Special Assessment